Portfolio Framework (WPV-01 to WPV-15)

Illustrative Engineering Studies

Simulated & Sample Work Notice The 15 studies below are proposed portfolio development models, sample engineering studies, and simulated technical projects designed to demonstrate WATTPVFY's methodology. They are not presented as completed commercial client assignments.
WPV-01 Illustrative Sample Study

Residential Electricity Bill Analysis

Evaluate 12-month domestic tariff slabs, effective unit cost, and preliminary rooftop solar sizing.

View Study Framework →
WPV-02 Illustrative Sample Study

Commercial Electricity Bill Analysis

Assess commercial ToD charges, sanctioned load utilization, and power factor impact.

View Study Framework →
WPV-03 Simulated Technical Project

Industrial Energy Consumption Profiling

Map HT industrial load factor, contract demand penalties, and captive solar opportunity.

View Study Framework →
WPV-04 Illustrative Sample Study

10 kWp Rooftop Solar Preliminary Feasibility

Desktop assessment of roof area, tilt, shading constraints, and indicative payback.

View Study Framework →
WPV-05 Illustrative Sample Study

50 kWp Commercial Solar Feasibility

Evaluate commercial rooftop self-consumption ratio, net-metering export, and system sizing.

View Study Framework →
WPV-06 Simulated Technical Project

100 kWp PVsyst Simulation

Simulate hourly solar irradiance, loss diagram, specific yield, and Performance Ratio (PR).

View Study Framework →
WPV-07 Illustrative Sample Study

Solar Project Financial Model

Build a 25-year dynamic cash-flow model with debt-equity structuring and downside sensitivity.

View Study Framework →
WPV-08 Illustrative Sample Study

100 kWp Solar DPR

Compile a bank-ready 20-section Detailed Project Report combining technical and financial data.

View Study Framework →
WPV-09 Illustrative Sample Study

Electrical BOQ Preparation

Prepare a structured, tender-ready electrical Bill of Quantities with item specifications.

View Study Framework →
WPV-10 Simulated Technical Project

Electrical Single-Line Diagram Package

Draft conceptual LT/HT Single-Line Diagrams detailing switchgear, metering, and protection.

View Study Framework →
WPV-11 Illustrative Sample Study

Cable Sizing and Voltage Drop Assessment

Calculate AC/DC cable cross-sections accounting for derating factors and voltage drop limits.

View Study Framework →
WPV-12 Simulated Technical Project

ETAP Load Flow Study

Model bus voltages, branch currents, and transformer loading under normal and peak conditions.

View Study Framework →
WPV-13 Simulated Technical Project

ETAP Short-Circuit Study

Determine symmetrical/asymmetrical fault currents to verify switchgear breaking capacity.

View Study Framework →
WPV-14 Illustrative Sample Study

Power Factor Correction Assessment

Calculate kVAr compensation requirements to mitigate low power factor penalties.

View Study Framework →
WPV-15 Illustrative Sample Study

Technical Proposal & Vendor Comparison

Conduct an apples-to-apples techno-commercial bid evaluation across multiple EPC quotes.

View Study Framework →
WhatsApp