← Back to Knowledge Centre

Technical Documentation

What Information is Required for a Solar DPR?

A Detailed Project Report (DPR) is the master techno-commercial document that bridges engineering design and financial underwriting. Incomplete inputs are the #1 cause of delays in DPR preparation and bank appraisal. Gathering the following five categories upfront streamlines the entire process:

1. Promoter & Business Profile

  • Entity constitution (Proprietorship, LLP, Private Limited), GSTIN, Udyam Registration, and brief operational track record.
  • Summary of last 2–3 years' financial statements (if applying for bank term financing).

2. Electricity Billing & Utility Data

  • 12 consecutive months of electricity bills showing kWh/kVAh consumption, sanctioned load, contract demand, and tariff category.
  • DISCOM name, consumer number, and existing net-metering or open-access eligibility notes.

3. Site & Roof Technical Information

  • Exact GPS coordinates / Google Earth pin and clear site/roof photographs.
  • Available shadow-free roof area, roof type (RCC vs. metal sheet), and nearby shading obstructions.

4. System Configuration & Cost Inputs

  • Proposed DC/AC capacity, preferred module and inverter technology (or vendor quotations if already collected).
  • Conceptual Single-Line Diagram (SLD), Bill of Materials (BOM), and expected implementation timeline.

5. Financing & Commercial Assumptions

  • Target debt-to-equity split, indicative interest rate, loan tenure, and expected annual tariff escalation.
  • Preferred lender format (e.g., SIDBI 4E, SBI, or standard corporate appraisal template).

NEED PROJECT-SPECIFIC ANALYSIS?

Apply this engineering framework directly to your facility or tender.

Request a Solar DPR → Request a Consultation
Technical & Professional Disclaimer DPR format requirements vary by bank, state nodal agency, and project scale. Final lender documentation checklists should be confirmed prior to submission.

Continue Reading

WhatsApp